Menu

Scrolling Announcement Banner

Google Services

Translate

Translate

Search

Search

Top Bar

Home Page
The Lyppard Grange Primary School Empowering children to be secure, engaged and equipped for life.

Building Work Update for Summer Term

We enter another phase of the build which this time involves the main entrance, offices and staffroom. Whilst this work takes place we will lose our main entrance into the building so there are some significant changes that you need to be aware of. After the holidays the School Office will be re-located temporarily within the school. We also have a temporary office portakabin at the front of the school which will be staffed during the following hours:- 

8.45am – 9.30am and 3.00pm – 4.00pm 

 

At all other times you will need to ring 01905 729383 to speak to staff in the office. Please ensure that your child has everything needed on arrival at school as unfortunately we will be unable to accept PE kits, Forest School kits, coats, lunches, drinks, homework etc during this period of disruption. 

As always, it would be helpful if parents are able to make medical/dental appointments out of school hours wherever possible. 

Bottom Section

Top